Cincinnati solar dealers: register the lead and define the Ohio project handoff
Prepare a Cincinnati dealer relationship around accepted leads, account verification, permit responsibility and customer closeout.
Define acceptance before selling under Origin
Confirm approved coverage, services, pricing permissions, lead registration, duplicate handling and the point at which an opportunity is accepted. Origin Direct stays separately tracked. A public referral code or dealer application does not establish exclusivity, capacity or authority to represent Origin.
Build a complete Cincinnati submission packet
Require customer and property details, authorized usage records, Duke Ohio and supplier information, accepted proposal, signatures, survey records and every related roof or electrical scope. Name the corrections contact and distinguish submitted from accepted.
Use the actual parcel to confirm jurisdiction. Cincinnati’s solar checklist identifies plan information for work under city authority. [2] Utility interconnection remains separate.
Track the customer handoff through closeout
Assign owners for engineering, permit corrections, installation, inspection, interconnection, monitoring transfer and service records. Show each milestone by evidence, not a promised date.
Review private redline, adders, splits, payment conditions and cancellations under the written agreement. A modeled commission is not an approved or paid amount.
Reconcile the sold scope before design release
Compare the customer-facing proposal with the registered opportunity before engineering begins. Verify system size, equipment, roof work, batteries, electrical adders, trenching, special access and every exclusion. If a survey or design finding changes the work, define who prices the revision, who explains it and which signature records customer approval.
Do not allow a verbal promise or an internal note to become an unpriced obligation. The accepted record should show the current scope, its revision and the documents on which the team is relying.
Create a communication and escalation rhythm
Name the dealer contact, Origin operating contact and customer-update owner. Agree when status is communicated and what happens when a permit correction, utility request, missing document or customer change blocks progress. Use the shared record so different team members do not provide conflicting dates.
Set a specific review cadence for stalled items and record the evidence required to clear each one. If the account, supplier, design or jurisdiction changes, pause the affected promise until the responsible reviewer updates the record. This keeps a customer-facing date from surviving after its underlying assumption has changed.
At closeout, deliver approved plans, equipment information, monitoring access, inspection and utility records, warranty contacts and any open service task. The customer should know who owns the next action even when installation is physically complete.
Bring these questions to onboarding
- Confirm market, registration and duplicate rules.
- Name the submission and corrections owners.
- Verify Duke Ohio, supplier and jurisdiction.
- Track permit, inspection and interconnection separately.
- Review compensation and service terms privately.
Primary sources
- City of Cincinnati: Solar + Clean Energy
Checked October 1, 2026. The city describes Duke Energy Ohio net metering at a high level. Verify the actual account, supplier and current tariff before presenting proposal assumptions.
- City of Cincinnati: Solar PV Installations Checklist
Checked October 1, 2026. Applies to residential and commercial solar submissions within city jurisdiction; confirm the authority for the exact parcel.
Origin’s workflow questions are editorial guidance. Current account permissions and written agreements govern representation, compensation and project responsibility. Utility references do not imply an affiliation.